Scope of Work
Land Preparation & Infrastructure Development
Industry
Coal Mining
Project Phase
Pre-Operational Stage
At Max Samruddhi Mining Pvt. Ltd., land preparation and infrastructure development form the essential foundation before heavy mining operations commence. This stage ensures operational readiness, safety, and regulatory compliance.
Systematic removal of vegetation, shrubs, and surface obstructions including stripping and preservation of topsoil as per environmental guidelines.
Construction of external approach roads and internal haul roads with proper grading, compaction, drainage, and dust suppression measures for safe HEMM movement.
Development of surface drainage channels, sumps, settling ponds, and installation of dewatering pumps to prevent flooding and ensure uninterrupted operations.
Establishment of on-site maintenance workshops, secured fuel storage facilities, equipment parking areas, and calibrated weighbridges for operational monitoring.
Installation of electrical systems, DG backup, site offices, communication networks, worker amenities, and safety infrastructure prior to heavy equipment mobilization.